The HyperCaster v4.3 and above supports Block Scheduling, a time-saving feature which allows the programmer to copy groups of events for insertion into different parts of the programming schedule.
The “Block Copy” feature is accessible from both the Classic and Calendar Programming views.
With the Block Copy feature, you can easily do things like copy an entire day’s worth of programming on Channel 1, and paste it to another day on that same Channel or other Channels. Or you can copy and paste a block of programming for a specific day part range, or save commonly used blocks of programming.
(Note: this feature was introduced in HyperCaster v4.3)